3 / 3

Event details

installation
name
Binbirdirek Cistern – Excavation
event type
Excavation
start date
1911
end date
1911 (Fixed date)
date comments
-
persons
-
description

During this excavation, a depth of c. 0.45 m was measured. The original capacity was much larger, but it had been reduced by over time sediment accumulation. The excavations indicated that the ground-level had risen by 3.06 m (Crow et al., 2008, p. 125).

comments
-